Stamicarbon, the innovation and license company of Maire Tecnimont Group, has signed a contract with Abu Qir Fertilizers Co., in Alexandria, Egypt, for the revamp of one of their urea melt plants (known as Abu Qir 3). Stamicarbon will deliver the license and the Process Design Package for the revamped plant, which is expected to be operational in 2025.
The urea plant was designed in 1996 with a name plate capacity of 1750 metric tons per day (MTPD) and a design capacity of 1925 MTPD, according to Stamicarbon’s CO2 stripping process.
Read full article here: https://www.stamicarbon.com/press-release/stamicarbon-signs-licensing-contract-urea-plant-revamp-egypt